10 Ton Grab Bucket Overhead Crane for a Concrete Plant in Pakistan

Date: 2026-11-20
Share us:

Delivery Time: 30 working days

Shipping Method: Sea freight

Payment Terms: 100% Letter of Credit (L/C)

Destination Country: Pakistan

Trade Terms & Port of Destination: CFR Karachi

Product Name: QZ Type Grab Bucket Double Girder Overhead Crane

Capacity: 10t

Span: 22.5m

Lifting Height: 10m

Working Class: A6

Operation Method: Cabin control

Voltage: 400V, 50Hz, 3-phase

Quantity: 1 unit

 

1.Customer Background

 

The customer is a middleman in the lifting equipment industry, mainly purchasing equipment and accessories for end users.

 

For middlemen, the selection of suppliers is not only based on price, but also includes product quality, delivery speed, and after-sales service. In early 2025, the customer initially contacted SEVENCRANE and inquired about a batch of motor-related accessories.

 

Due to the long service life of the existing cranes for the end users, some accessories were no longer compatible. SEVENCRANE was temporarily unable to provide the corresponding supply, so it suggested that the customer contact the original equipment supplier for purchase.

 

2.Scheme Transformation

 

In April 2025, the customer attended the Bauma exhibition in Germany and communicated with our manager about the previous project at the exhibition.

 

Based on the equipment photos and communication information previously, SEVENCRANE learned that this was a grab bucket double girder overhead crane for a concrete plant. The equipment had been in use for many years and the overall condition was relatively old.

 

The grab bucket overhead crane is used in the concrete plant for the grasping and transportation of aggregates and sand. The working environment has a lot of dust and frequent starts. When the equipment reaches its service life, the problem is not usually with a single motor, but rather the aging of the structure, transmission, and electrical components simultaneously. Replacing a single part can only temporarily maintain the operation.

 

Considering the equipment’s service life and overall condition, SEVENCRANE suggested that the customer communicate with the end user and consider replacing the entire machine instead of continuing to invest in replacing individual parts. The customer accepted this suggestion and successfully persuaded the end user to adopt the entire machine update solution.

 

This transformation reflects that SEVENCRANE not only focuses on what the customer currently needs to purchase, but also proposes more reasonable long-term solutions based on the actual condition of the equipment.

 

3.Technical Scheme

 

After the customer accepted the entire machine update solution, both parties further confirmed the equipment parameters. The customer also provided the drawings of the original bridge crane for our technical team to reference.

 

The final confirmed equipment was the QZ type double girder overhead crane, with parameters 10T-22.5M-10M, equipped with a grab bucket for transporting raw materials in the concrete plant.

 

Using the original equipment’s span and track distance means that the new bridge crane can directly land on the existing factory tracks without large-scale steel structure renovation, which is one of the key reasons why the entire machine replacement solution was accepted by the end user.

 

The additional accessories purchased by the customer include: Bridge Travel Motor, Bridge Travel Gearbox, Complete Hydraulic Rod Brakes for Bridge Drives.

 

These accessories correspond to the main drive components, and the customer hopes to keep spare parts for the key transmission components to reduce downtime caused by waiting for accessories.

SEVENCRANE-10t-overhead-crane

4.Detailed Configuration

 

The customer’s requirements for the equipment are very detailed. They not only focus on the overall performance of the crane, but also have clear requirements for the specific configuration of the electrical system.

 

The requirements for the electrical control cabinet include: cabinet color RAL7035 light gray, IP41 protection, TN-S grounding.

 

RAL7035 is the commonly used light gray color in industrial sites, which is convenient for coordination with factory equipment and workshop environment; IP41 covers the basic protection for indoor dust environments; TN-S grounding relates to the electrical safety of the entire production line and needs to correspond to the wiring method inside the control cabinet.

 

SEVENCRANE adjusts the electrical system configuration according to the customer’s requirements and confirms each technical detail proposed by the customer with the technical department one by one.

 

Based on the final confirmed technical requirements, the quotation is revised to ensure consistency with the customer’s requirements.

 

5.Order Confirmation

 

From the initial inquiry for spare parts, to communication at the exhibition, and to the confirmation of the complete machine solution, both parties had multiple rounds of technical and business exchanges.

 

The customer carefully confirmed the equipment parameters, electrical configuration, and spare parts list. SEVENCRANE adjusted the quotation multiple times according to the customer’s requirements and finally formed a mutually agreed solution.

 

In July 2025, both parties officially confirmed the order. The payment method is 100% letter of credit (L/C), and the customer completes the payment arrangement through the letter of credit.

 

The letter of credit has high requirements for the completeness of documents. The statements of invoices, packing lists, and bills of lading must be consistent with the contract. This also requires the configuration list confirmed in advance to be accurate enough.

 

6.Installation Support

 

During the order confirmation process, the customer specifically requested that after the equipment arrives, engineers should be arranged to provide installation guidance.

 

SEVENCRANE agreed to this request and promised to arrange engineers to go to the local area to assist with the installation after the grab bucket overhead crane arrived.

 

In the complete machine replacement project, track alignment, limit adjustment, and grab bucket debugging all require on-site judgment. With the presence of engineers, the end customer does not have to figure it out by themselves.

 

Currently, the equipment is scheduled to be dispatched this month, and the subsequent transportation and installation support will be advanced according to the agreement.

 

7.Case Summary

 

The customer initially only sought spare parts for old cranes. After further communication at the German BMW exhibition, the project eventually transformed into a complete machine update project.

 

SEVENCRANE proposed replacement suggestions based on the condition of the old equipment and continuously cooperated in terms of technical configuration, detailed requirements, quotation adjustment, and installation support. Finally, a 10-ton grab bucket double girder overhead crane order was achieved.

SEVENCRANE-factory bridge crane

en_USEnglish
Henan Seven Industry Co., Ltd
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.