Precautions and detailed confirmation of electric chain hoist lifting
Date: 2023-12-18
Share us:
The electric chain hoist suppliers has a wide range of application scenarios. It appears in more and more production and life, and the usage rate is very high. So under such a high degree of usage, it has become a must for us to use it efficiently while ensuring safety. Things to pay attention to, today we will focus on the lifting precautions and operating details of the electric hoist.
Preparations and precautions for electric hoist lifting Before hoisting, the construction hot sale electric chain hoist suppliers for sale should be inspected to ensure that the hoist is being used without any hidden dangers. The hoisting area should be divided into hoisting alert areas, with specialized alert personnel. Operators should conduct process training and confirmation, and unify hoisting signals and gestures to ensure coordinated actions at each position. The hoisting process strictly implements the rules of “Lifting and Hoisting Command Signals” (GB5082-85). Hoisting is done through walkie-talkies and gesture commands. The command signal transmission process is executed by the general commander, post commander, and operator. Before hoisting, you need to check whether the tonnage of the factory supply electric chain hoist suppliers price goods matches the electric hoist. Hoisting over tonnage is strictly prohibited. Check that equipment chains and hooks are in good condition and safe. Check whether the operating buttons are genuine. Check whether the lifting gantry track and mixed wheel set are safe and strong. Whether it is normal and whether the hanging point is firm.
Confirmation of lifting points and lifting objects: The standard length of the electric chain hoist suppliers manufacturer is three meters. (The chain length can be customized according to the usage requirements.) After first confirming that the chain and hook are normal and correct, the hook should be fixed at the center of the lifting object so that the two The end components should be basically the same, and the lifting process should be as smooth as possible. Use two 3-ton * 6-meter slings to fix them at a 60-degree angle at both ends of the electric hoist and find a lifting point that can balance the hanging parts. Check the fixing condition of each part of the hoisted goods, and lift it correctly after fixing. During the lifting process, try to achieve a smooth and uniform speed, and clear away irrelevant personnel under the cargo. Remember that the goods being hoisted cannot exceed the rated tonnage of the electric hoist to avoid dangers such as falling objects, chain breakage, or hook rupture.
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Strictly Necessary Cookies
Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.
If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.